Recently Completed

Full SwingFull Swing Sports Center – Prescott Valley, AZ

GBE provided professional services for these new batting cages in Prescott Valley, Arizona. The project included a 9,000+ square foot building structure, paved parking areas and concrete flatwork. GBE was responsible for all civil engineering and surveying which included overall project management, grading and drainage design, public water and sewer main extensions, construction plan development and post-design services.

NatlBank1WEB National Bank of Arizona – New Branch,  Chino Valley, AZ 

GBE provided professional services for this new branch in Chino Valley, Arizona. The project included a 3,000+ square foot building structure, paved parking areas and concrete flatwork. GBE was responsible for all civil engineering and surveying which included overall project management, grading and drainage design, public water and sewer main extensions, construction plan development and post-design services.

TOYTUB1Flyz Toy Tub – Prescott, AZ

Prescott, AZGBE provided professional services for this new car wash in Prescott, Arizona. The project included a 2,700+ square foot building structure, paved parking areas and concrete flatwork. GBE was responsible for all civil engineering and surveying which included overall project management, grading and drainage design, public water and sewer main extensions, construction plan development and post-design services.

Superior IndustriesSuperior Industries – Prescott Valley, AZ

GBE provided professional services for this industrial development in Prescott Valley, Arizona. The project included a 25,000±sf building addition and a 19,000±sf new concrete parking area. Other site improvements include grading of the main storage yard and expansion of the existing detention facility. GBE was responsible for all civil engineering and surveying which included overall project management, grading and drainage design, public water and sewer main extensions, construction plan development and post-design services.

12089-Dexter-Revised-Final-Plan-Sheets-2013-1-8-8Dexter Neighborhood Sidewalk Improvements – Prescott, AZ

Granite Basin Engineering was recently selected by the City of Prescott to provide engineering services for the 2013 Dexter Neighborhood Sidewalk Improvements. The project included more than 23,000 square feet of sidewalk improvements along Bird Street, Ruth Street, Dameron Drive and Navajo Drive. The scope of work included all necessary curb ramps conforming to ADA requirements, driveways and all incidental removals and relocations to accommodate the new sidewalk. A bid alternate was included for sidewalk installation along 2nd Street and the east end of Hillside Avenue due to anticipated costs and the need to stay within established CDBG funding.

A detailed topographic survey was completed to accurately quantify all incidental removals and relocations necessary to accommodate the new sidewalk. This included detailed locations of all trees, fences, driveways, mailboxes, utilities, and any surface feature relevant to the scope of work. This project had an aggressive schedule mandated by the CDBG funding process; design and bid documents were completed within 60 days of contract award over the course of the holiday season.

2Tractor Supply – Prescott Valley, AZ

GBE provided professional services for this commercial development in Prescott Valley, Arizona. The project included a 22,000±sf retail center and approximately 2.2±acres of new paving and concrete flatwork. GBE was responsible for all civil engineering and surveying which included overall project management, grading and drainage design, public water and sewer main extensions, construction plan development and post-design services.

Tractor Supply – Wickenburg, AZ

GBE is currently working on construction plans for this commercial development in Wickenburg Valley, Arizona. The project includes a 22,000±sf retail center and over 2±acres of new paving and concrete flatwork. GBE is responsible for all civil engineering and surveying which includes overall project management, grading and drainage design, public water and sewer main extensions, construction plan development and post-design services.